One Room Challenge Week 4: More Demo!

It’s WEEK FOUR of the Spring 2021 One Room Challenge and it’s finally GO TIME!

We are halfway through the ORC and after several weeks of being stuck in limbo waiting for the best time to finish the demo of our bathroom, we finally get to rip out the tub and shower surround! We have taken several days off surrounding the long Memorial Day weekend to get as much work done as possible before we head back to work next week. To say we have our work cut out for us would be an understatement.

IMG_0923 (1).JPG

To Do:

  • Remove Shower Fixtures, Tile Walls and Bathtub

  • Patch subfloor

  • Install wall for built-ins

  • Install Drywall

  • Install shower and floor tile

  • Paint

  • And so much more!

If you’re wondering how we could possibly finish this space in the next four weeks… same.

Check back next week for a peek at the room progress! For more updates throughout the week be sure to follow along on Instagram and don’t forget to check out the progress of each of the Featured Designers and Guest Participants spaces.

ORC-Guest-400x218.png
Jenna OgleComment